Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 9 results ...
Al-Sobiei, O S, Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(04), 423-30.
Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(04), 355-64.
Dainty, A R J, Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: the perspective of small-medium-sized firms. Construction Management and Economics, 23(04), 387-98.
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(04), 377-85.
Liu, S L, Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(04), 347-53.
Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(04), 409-22.
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(04), 399-408.
Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(04), 365-75.
Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(04), 431-41.